- Home
- Government
- Departments
- Community Development
- Planning Division
- Approved Projects
- Village Expansion Project (Restoration Hardware)
Village at Corte Madera Expansion Project (Restoration Hardware)
Corte Madera Village, LLC (“CMV”) proposes to expand The Village by adding a retail store of approximately 42,000 square feet of gross floor area, proposed as a Restoration Hardware design gallery and restaurant. As part of the project, CMV proposes to acquire and pave the existing gravel parking lot currently owned by the Town, located north of the shopping center across Redwood Highway. The complete project description, proposed plan set, staff reports, and other documents can be accessed below.
Plans and project description
Permit Amendment
- March 2018- Planning Commission Staff Report for April 24, 2018 meeting - dated April 20, 2018
- Planning Commission Public Hearing Notice for April 24, 2018 meeting - dated April 10,2018
- Environmental Impact Report Addendum - dated April 18, 2018
- Amended project description - dated March 1, 2018
- Design Supplement (Approved and Revised Elevations and Floor Plans) - dated April 19, 2018
- Revised Plans (complete set) - dated March 5, 2018
- Smaller file sizes:
- Sheets A1, C1-C8, and L1-L3 (Title sheet, civil, conceptual landscape)
- Sheets A2.1-A11 (Renderings, Elevations)
- Sheets A12-A21 (Floor plans, materials board, sign, site photos, flood proofing)
- Sheets RHL1-RHL7 (Landscape)
Approved Project
- December 2017Plans and project description
- Project Description - updated March 10, 2017
- Village at Corte Madera Restoration Hardware Plans (complete set) - Dated November 29, 2017
- Smaller file sizes:
- Sheets A1-L3 (Title Sheet, Civil, Conceptual Landscape)
- Sheets A2.1-A2.5 (Renderings)
- Sheets A3-A14 (Site Plan, Elevations, Sections, Site Line Study, Floor Plans)
- Sheets A15-A21 (Materials, Images, Sign Details, Flood Proofing)
- Sheets RHL1-RHL7 (Landscape/Planting Plans)
- Village at Corte Madera Restoration Hardware Plans (complete set) - Dated November 7, 2017
- Smaller file sizes:
- Sheets A1-L3 (Title Sheet, Civil, Conceptual Landscape)
- Sheets A2.1-A2.5 (Renderings)
- Sheets A3-A14 (Site Plan, Elevations, Sections, Site Line Study, Floor Plans)
- Sheets A15-A21 (Materials, Images, Sign Details, Flood Proofing)
- Sheets RHL1-RHL7 (Landscape/Planting Plans)
- Village at Corte Madera Restoration Hardware Plans (complete set) - Dated October 23, 2017
- Smaller file sizes:
- Sheets A1-L2 (Title sheet, Civil, Conceptual Landscape)
- Sheets A2.1-A2.5 (Renderings)
- Sheets A3-A14 (Site Plan, Elevations, Sections, Floor Plans)
- Sheets A15-A21 (Materials, Images, Sign Details, Flood Proofing)
- Sheets RHL1-RHL7 (Landscape/Planting Plans)
- Village at Corte Madera Restoration Hardware Plans (PDF) - dated November 9, 2016
Story Poles
- dated October 16, 2017Staff Reports
- December 5, 2017 Town Council Staff Report - dated November 30, 2017
- Smaller file sizes:
- Staff Report
- Attachments 1-6
- Attachments 7-14
- Video recording of the November 14, 2017 Planning Commission hearing
- Public Comments received between November 7, 2017 and November 13, 2017 at 5pm (after the Staff Report release, and prior to November 14, 2017 public hearing)
- November 14, 2017 Planning Commission Staff Report (complete staff report) - dated November 7, 2017
- Smaller file sizes:
- Staff Report and Attachments 1-5
- Attachments 6-10
- Attachments 11-14
- August 8, 2017 Planning Commission Staff Report - dated August 4, 2017
- February 2, 2016 TC Staff Report - Status of Proposed Restoration Hardware Project
- February 2, 2016 TC Staff Report - Contract with GHD Phase 2 of EIR for VCM 2016 Expansion Project
- October 6, 2015 TC Staff Report - Agreement with GHD Phase 1 for Village Expansion EIR
Public Notices
- Town Council Public Hearing Notice December 5, 2017 - dated November 17, 2017
- Additional Information regarding the Village at Corte Madera Expansion Project (Restoration Hardware) - dated November 3, 2017
- Planning Commission Public Hearing Notice November 14, 2017 - dated October 31, 2017
- Letter to Community Regarding Story Poles for proposed Restoration Hardware Building - dated October 16, 2017
- Planning Commission Public Hearing Notice August 8, 2017 - dated July 28, 2017
Environmental Review Documents
- Final Environmental Impact Report (FEIR) - dated November 1, 2017:
- Final Environmental Impact Report (complete report, 14MB)
- Smaller file sizes:
- Pages 1-1 to 1-2 (Introduction)
- Pages 2-1 to 2-61 (Comment letters, Public Hearing Comments, and Response to Comments)
- Page 3-1 (Author-initiated Changes)
- Page 4-1 (References)
- Appendix A (Revised Transportation Impact Study)
- Draft Environmental Impact Report (DEIR) - dated July 12, 2017:
- Draft Environmental Impact Report (without appendices)
- Appendix A (NOP and Letters)
- Appendix B (Project Plans)
- Appendix C1 (Biological Resources Assessment)
- Appendix C2 (Peer Review of BRA)
- Appendix D1 (Geotechnical Report - The Village)
- Appendix D2 (Geotechnical Report - Gravel Lot)
- Appendix E (CalEEMod)
- Appendix F (Noise and Vibration Analysis)
- Appendix G (Traffic Impact Study)
- Notice of Availability - Draft Environmental Impact Report - dated July 12, 2017
- GHD Village 2016 Expansion Proposal
- December 2015 Technical Memorandum
- Scoping Meeting for Draft Environmental Impact Report - November 17, 2016:
- Notice of Preparation and Notice of Scoping Meeting for a Draft Environmental Impact Report
- Scoping Meeting Presentation
- Scoping Meeting audio recording